Precast T-girder formwork
|
|
|
|
|
||||
1
|
Material
|
Q235B, Q355Steel.
|
|
|
||||
2
|
Design time
|
The preliminary technical plan design will take 3 days.
|
|
|
||||
|
|
The fabrication drawings will take 5 days to design.
|
|
|
||||
3
|
Fabrication
|
The normal duration is about 40 days.
|
|
|
||||
4
|
Painting
|
Each formwork is painted three times: a primer, a middle paint, and a top paint. This prevents rust from corroding the formwork.
|
|
|
||||
5
|
Delivery
|
Boyoun maintains positive relationships with many logistics companies to ensure prompt delivery of formworks to the port.
|
|
|
||||
6
|
Installation on Project site
|
Boyoun can assign one or two engineers to provide technical support at the project site.
|
|
|
Boyoun was founded in Beijing in 2006 and its headquarters are located in Binzhou Industrial Park in Shandong Province. Boyoun has over 400 employees, with over 40% being technical engineers. Boyoun focuses on Bridge formwork R&D, Production, Rental, and technical services,which is a national hign-tech enterprise. The production base with a area of 100000㎡.The capacity of infrastructure equipment is 100 thousand tons.We have opened up emerging markets represented by Southeast Asia, Russia, Africa and the Middle East, and laid out in advance to contribute to the national “One Belt, One Road” strategic concept.