8b925ea458483fa48dd5b2860406a694.jpg
c84cfe8ee6803e8e80a35c4fdd297e22.jpg
f4dc1225c04b32dca5f5e0d24e944aed.jpg
7c18611a6b8f3cfc94d360c9cb790380.jpg
NaN / 0

Garbage Shredder Machine Municipal MSW Waste Recycling Production Line Solid Waste Shredder

Get Latest Price
US$ 4800
≥1 Sets

Quick Details

Max.Production Capacity (kg/h):
60000
Place of Origin:
Henan, China
Production Capacity (kg/h):
2000 - 3000 kg/h
Brand Name:
YUXI
Product Details
Municipal Waste Solid Waste Shredder production line of recycling waste
Product Description
The city solid waste is increasing quickly with the development of the society, our company launched a new production line of municipal solid waste treatment according to this phenomenon. Comprehensive treatment of city solid waste processing system is developed to adapt to different places and have a full consideration of hte environment situation. According to the different needs of customers, provide advanced pretreatment technology and advanced process equipment for you to maximize the satisfaction of city life garbage treatment soil reduction, harmless, resources of industrial policy.
Garbage Shredder Machine Municipal MSW Waste Recycling Production Line Solid Waste Shredder

THE COMPLETE MSW SORTING LINE SYSTEM CAN CONSIST OF THE FOLLOWING MODULES:

- Feeder system
- Preliminary Sorting (glass, oversized etc. - manual),
- Fe - separation
- Sorting (PET, paper, cardboard, film, aluminium etc.)
- Baling press
- Container and belt conveyors
Flow Chart
Garbage Shredder Machine Municipal MSW Waste Recycling Production Line Solid Waste Shredder
Model
YX-100
YX-200
YX-400
Raw material
Municipal solid waste, household waste, industrial waste, landfill waste and mining waste
Capacity
5T/H
10T/H
20T/H
Power
149 KW
224 KW
279 KW
Area
2400 SQM
2800 SQM
3000 SQM
Working Time
20 hours
20 hours
20 hours
Garbage Shredder Machine Municipal MSW Waste Recycling Production Line Solid Waste Shredder
Garbage Shredder Machine Municipal MSW Waste Recycling Production Line Solid Waste Shredder
Product Show
Packaging and Shipping
Packing:
1 . For the loose cargo we will packing by wooden box.
2 . For the full container loading we are packing the machine by film and some on pallet accordingly
Delivery:
1.We can shipping the goods by air or by sea.
2.We will send pictures of cargo loading to our client to check and keep recording.
3.We can send cargo to client's warehouse to loading
4.We have free spare parts with the machine.
Our Service

• Pre-sale

we given client the details technician offer, sign the sales contract etc

• In-sales

we supply the details layout, installation instruction, technician support for the clients.

• After sales

we arrange engineer to install the machinery and training the workers for client.
• We have 24 hours team to solve the after sales problem
• We have free spare parts with the machine.
• We supply long term spare parts for every customer.
• We always up date the new technology to every customer.
FAQ
Q1: How to choose proper products you want?
• Please tell us as detail as what you want? • What's your raw material it is? • What's the final products you want to produce?
• What capacity you want it performance?

Q2:About the Payment?
A:40% by TT as deposit on signing the contract, 60% by as final payment of balance after the client's satisfactory inspection of the equipment prior to the goods leaving the factory.

Q3: What about Warranty? what will we do if the machine is broken down?
A: The warranty period for all of structural and mechanical equipment is one year. The warranty period for all electric motors is half one year. Wear parts are not covered by warranty unless the component part is found to be flawed.

Q4: What could you help me to do for the business?
A:Thanks for your trust , we can provide you with proposal chart for complete production lines,spot inspection and operator traning according to your demands and the conditions of applied spot , we can help you choose the right equipments for your different scrap meterial.

Q5:Delivery time
A: Depends on the type and number of crushers,in general,about 30-45days.