Our Main Products are Francis Turbine, Turgo Turbine, Pelton Turbine, Kaplan Turbine, Tubular Turbine and Hydro Generator.
Other Hydropower Equipment Accessory Equipment such as Governor, Inlet Valve, Generator Interagted Panel are also our Products.
They are used at Middle and Small Hydropower Plant or Hydropower Spot.
The rated output from 100KW to 10,000KW is our advantage.
Below is our business about Hydropower Plant
1: Making Technical Proposal and Desiging Machine Sets
2: Basic Hydropower Plant Machine, Hydro Turbine, Generator and relative equipment.
3: Booster Station Machine Set at Hydropower Plant Including Transformer
4: Hydropower Plant Maintenace and Expansion.
5: EPC Hydropower Plant Project
As you know, Hydro Turbine is Customized Product according to differnt hydropower plant situation.
Therefore the below basic paramter of yydropower plant is useful to Make Technical Proposal and Offer Qutation for you.
1: Water Head: ___ m
2: Water Flow: ___ m3/s
3: Electric Frequency: 50Hz or 60Hz
4: Generator Voltage: ___ V
5: On- Grid or Off Grid
6: If On Grid, how's the On Grid Voltage: ___ KV.
The best is that you've got the Feasibility Study Report. That will be more helpful for our work.
1: Making Technical Proposal
According to your basic parameter ad expected output and installed capacity, we will make the technical proposal for your reference and selecte the best suitable type of wheel for you
For Example:
H=27.75m; Q=2x3.7m³/s ,750KW one Set
our proposal as below
a: Francis Horizontal Turbine , Wheel Type: A551C #, Wheel Diameter:73cm,Rated speed---720rpm, Runaway speed--1080rpm
b: Rated Output 750KW Generator ,12 Poles, Excitation Method: Brushless Excitation
c: Inlet Valve: Butterfly Valve, DN1200-10
d: PLC Governor: GLYWT-600
e: Generator Integrated Panel
f: Other Equipment Accessories will be disscuss with you , such as Outdoor Switchyard Equipments, Power Sources System, Cooling Water System.
2: Making CAD Drawing of Machine
after settle the Techinical Proposal , we will offer machine drawings.
3:Equipment Delivering and Installing
After 5-6months producing and complete acceptance check.
The Equipment will be delivered and we help u to install them.
There will be 2 years warranty. We will go to your plant to solve problems if needed.
We have serviced for more than 500 hydropower plants.
For all you questions and enquiries about kinds of hydro turbine and hydropower plant equipment and hydro power plant itself, we 're glad to reply u at anytime, even you are just seeking suggestions
Mandy Wang