Payment term:
|
30%TT as deposit, the balance will be paid by TT before loading.
|
ODM & OEM:
|
available
|
||
Certificate :
|
ISO9001 CE SGS |
Drawing time:
|
2~3days
|
||
Sample time:
|
15~20days
|
Bulk production time:
|
45~55days
|
||
Description:
|
1) Material: Plywood, MDFwith natural veneer OR Technology veneerLaminate as approval from
client |
|
|
||
|
2) Fabric,PU , leather: High-grade fabric/PU leather provide ( Fire retardant, SR 70,000 rub ).
|
|
|
||
|
3) Foam: more than 40 degree density , CA117 and BS5852 standard fire retardant
|
|
|
||
|
4) Solid wood:Ruber Oak Wood,Ash Wood,American Oak Wood,Birch wood
Beech wood ,Teak Wood ,Wanult wood as approval from client |
|
|
||
|
5) Finish : High scratch-resistant and environment-friendly finishing.
|
|
|
||
|
6) Hardware :DTC, Blum , Hafele as approval from client
|
|
|
||
|
7) S.S:Grade 201,304 stainless steel
|
|
|
||
|
8) Struction :Double-dowelled joints ensured to be tight and uniform .
|
|
|
||
|
9) insect treatment:Special treatment of acid and alicikl resistance
insect prevention and anti-corrsion. |
|
|
||
How to cooperation
|
1 :IF you have furniture design ; make the exactly quotation list----confirm the contract-----
provide the fabric and wooden samples------make the shop drawings for each item---- confirm all the samples and drawings-----start to produce the goods----- examine the goods on line------Loading the good 2 :IF you dont have furniture design ; Give the suggest to you -----make the furniture proposal based on your layout plan ----make the exactly quotation list----confirm the contract----- provide the fabric and wooden samples------make the shop drawings for each item ---- confirm all the samples and drawings-----start to produce the goods----- examine the goods on line------Loading the good |
|
|
||
|
|
|
|
||
|
|
|
|