Detail Information About ABS PLA 3d plastic filament extruder machine SHSJ25mm PEEK Filament Extrusion Line
The Composition of ABS PLA 3d plastic filament extruder machine SHSJ25mm PEEK Filament Extrusion Line |
|||
NO. |
Machine Name |
Quantity |
Remark |
1 |
SHSJ-25mm Extruder |
1SET |
25mm Screw +12kg hopper |
2 |
Extruder Mould |
1SET |
1.75mm and 3.0mm |
3 |
Water Tank |
1SET |
Hot water +Cold Water |
4 |
Puller |
1SET |
Two Wheels |
5 |
Winder |
1SET |
Single Spool Tension Control |
6 |
Laser X |
1SET |
Tolerance Show |
1.SJ2 5 / 2 5 Single screw Extruder (PLC Control ) 1SET
1.1: Motor Φ 2 5 / 25
1.2: Screw (Special for PLA ABS etc. )
Diameter: 2 5 mm
L/D: 2 5 :1
Raw material : 38CrMoAlA
surface treatment : Nitrogenization and polished
Inner surface treatment: Nitrogenization and polished
2. Extruding Mould 1.75mm /3.0mm 1 SET
2.1: Steel Material: S136
2.2: Size: According to sample size
3 .Water tank 1SET
3 .1: Raw material 304#
3 .2: Size 50 0 x100x120 mm
3 .3: Power: 5W
3.4: First Step: Hot water Second Step: Normal Water
4. Two wheel puller 1 SET
4 .1: Power : 60W
4 .2: Diameter of wheel Φ 50 mm
4 . 3: Surface : PU
4 .4: Single phase electronic speed governor control
5 . Single Auto winder 1 SET
5.1: The diameter of Winder Diameter: 200 mm Width:100 mm
5.2: Torque motor : 0.3N.M(Per set)
5.3: Drive : Timing belt round control
5.4: Synchronous wheel transmission device cable
5.5: Raw material : A3
Note : The winding machine by separate
6 . Laser Machine 1 SET
6.1: Measure range: 0.1mm-10mm
6.2: Diameter measure meter accuracy:+/-0.002mm
6.3: Caliper gauge with feedback device, can control the extruder screw
rotational speed in fixed filament diameter
6.4: Can measure the transparent round shape products
1. One year warranty, subject to the proper use during this period by the buyer , free spare parts are available to replace to malfunction parts due to our machine quality defects, delivery freight for the parts is borne by the buyer.
2. The supplier provides service manual and maintenance instruction of main electric appliance, limb, usages manual of equipment.
3. The buyer shall, before making delivery, conduct a precise and comprehensive inspection of the goods at the seller ’ s workshop. T he testing material should be supplied by the buyer, if the buyer couldn ’ t supply the material in time, the related testing material cost would be paid by the buyer.
4. T he seller could offer the service of installation, debugging and training, but the air tickets, insurance, eating, housing and USD 80.00/ day for each engineer will be paid by the buyers.
5.Free technical support, any enquiries on using machines, our engineer will provide you with professional technical support by mail or phone in 24hrs.