Contact us
|
|
|
|
|
||||
Whatsapp:
|
+8615253666158
|
|
E-mail:
|
shengbaofrp@gmail.com
|
||||
Skype:
|
+8615253666158
|
|
YouTube
:
|
@ShengbaoFRP
|
||||
Address:
|
Shandong province Sheng bao Group south district
|
|
|
|
||||
Price reminder:
|
|
|
|
|
||||
The product price of $500 is the deposit amount, not the real sales price of the product, if you need to buy, please contact me to provide you with the real price of the product!
|
|
|
|
|
Usually need to know the following information
|
|
|
||
Application:
|
|
(Explanation: Where will the cooling tower be used? For example in HAVC systems, air compressors, melting furnaces, etc.)
|
||
* Water flow:
|
m3/hour
|
(Explanation: How many tons of water are needed per hour?)
|
||
* Inlet water temperature:
|
°C
|
(Description: The temperature of the hot water to be cooled)
|
||
* Outlet water temperature:
|
°C
|
(Note: The temperature of the cooling water is usually at least 3~4°C higher than the wet bulb temperature.)
|
||
* Wet bulb temperature:
|
°C
|
(Explanation: The location/area or city where the tower is installed has the highest wet bulb temperature critical for evaluating
tower size) |
||
* power supply:
|
|
(Note: 380V/3 phase is standard, we can have it in stock, but for customized towers, the delivery time may be longer)
|