1620b03610923ea78ed5fca87976a8c2.jpg
be121fea9d2f3ae9aa792375b2ee1948.jpg
83812284c9fa30babc9d1b752588672d.jpg
e23c106d041033f5a8ca0dc6782ce747.jpg
NaN / 0

Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line

Get Latest Price
US$ 8500
≥1 Sets

Quick Details

Machinery Capacity:
4000BPH, 2000BPH
Packaging Material:
Plastic, Wood, Other
Filling Material:
Water
Filling Accuracy:
≥99.8%
Product Details
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line
We are confident about our product quality because of the Quality Assurance System backed by technical capabilities and production capacity. We believe “all steps in production are quality control processes”.
Final Products
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line



Capacity (500ml bottles): 2000-20000BPH
Suitable bottle shapes:
PET circular or square
Bottle diameter(mm): φ 50-115mm
Bottle height (mm): 160-320mm
Products Description
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line
This pet bottle drinking water plup filling machinery has washer,filler,capper three functions in one body, total process is automatic.
Automatic 500ml Bottle Bottled Water packing and Filling Machine
It is suitable for high temperature resistant PET/Glass/Aluminum bottled drinking water filling. It applies advanced micro-pressure gravity type filling principle, with perfectrecirculation system, also can reach separately gas return, without contacting with material, avoid secondary pollution and oxygen. It is made of high quality SUS304 stainless steel.
Main components of water packaging machine are processed precisely by CNC machine tool.
Details Images
- All 304/316 stainless steel construction - Air conveyor entering bottles ​ - Stainless steel entrained plastic pads ensure minimal bottle bumping during washing. - Durable cleaning pump,high precision filling nozzle - Place and capping system, electromagnetic capping heads, with burden discharge function, make sure minimum bottle crash during capping
- Capping effect is stable and reliable, Defective rate ≤0.2%
Pure Water Filling Capping Bottling Machine For Full Automatic 330Ml 550Ml Plastic Bottle Drinking Mineral Water Filling Line

Special design for washing part

-Washing part accept inductive water spray design, saving water consumption.

Special design for capping part

- The upper cover part adopts a detachable design, which is convenient to adjust the torque.

Main Features.

1: Intelligent : The machine operation is controlled by the advanced touch screen, which can realize human-machine communication. 2: Convenience : To change the size of the filling bottle, only the star wheel and other components need to be replaced. 3: Cleaning : The parts in contact with the medium are made of stainless steel, with no dead ends in the process and easy to clean. 4: Conveying : It adopts an efficient capping system and has a complete self-control protection device. 5: Safety : Equipped with perfect overload protection device to protect equipment and operators.
Product Paramenters
Model
CGF8-8-4
CGF14-12-5
CGF18-18-6
CGF24-24-8
Production
Capacity
2500BPH~3000BPH
3500BPH~4000BPH
6500BPH~8000BPH
10000BPH~12000BPH
Bottle height
330mm
Bottle diametar
50~100mm
Bottle volume
0.2~2L
Rinsing pressure
0.2~0.3Mpa

Rinsing water
consumption
0.5T/H
0.15-0.35
0.15-0.35
0.15-0.35
Filling precision
±2~3%
0.2-0.25
0.2-0.25
0.2-0.25
Power
3ph,380V/50Hz,1.5Kw
3ph,380V/50Hz,1.5Kw
3ph,380V/50Hz,2Kw
3ph,380V/50Hz,3Kw
Related Products
Water Treatment System
Bottle Blowing Molding Machine
Capacity:1-20T/H
Capacity:Up to 18,000 BPH
Sleeve Labeling Machine
Shrink Film Wrapping Machine
Capacity:Up to 30,000 BPH
Capacity:25bags/min
Why Choose Us
Zhangjiagang NewPeak Machinery Co., Ltd. is located in Zhangjiagang City, Jiangsu Province, China, and is one of the professional manufacturers with more than 25 years of experience in this field. Newpeak Machinery has a modern workshop of 5,000 ㎡ by our QC team , and each equipment that leaves the factory will be debugged and inspected by a number of experienced engineers. In order to give customers a better experience, we are equipped with an independent technology research and development department.. The high-precision filling nozzle and the latest constant torque capping device are developed from this. We provide customers with: water, juice, tea beverages, carbonated beverages, beer and other liquid filling lines. Our production lines have been installed in more than 56 countries . "Quality, Integrity" is the foundation of Newpeak's existence. Newpeak is well received by the majority of users. The company has established a solid position in the industry. Newpeak provides beverage filling solution, and warmly welcomes people from all walks of life to visit our company for inspection and guidance. Achieve win-win cooperation!
Invention patent
Our R&D team has been constantly innovating in the research and development of beverage machinery accessories, focusing on providing customers with a better experience.

Certificates.

We have been producing our goods with mature technique and first-class quality. Our products are not only marketed inland, but also exported to all over the world, Such as: Africa, Mid East, South Asia, South America. We believe
truthfulness,conscientiousness, enterprising spirit, continuous improvement and creativeness in running business, which helps our finest products enter the market.

Our Manufacturer Factory.

At present, we manufacture and provide the following lines to our customers:Beverage Filling Complete Line、water treatment plants、water filling machine、beverage filling machine、beverage preparation system、packages equipment coding machine、labeling machine、PE Film Shrink Wrapping Machine、Injection machine、Blow Molding Machine.
We welcome distributors and factory owners from around the world to cooperate with us and look forward to receiving your inquiries in the near future.

Our customers

Our products are exported to all over the world
Recommend Products
FAQ
Q: Are you a manufacturer or a trading company? A: We are the source factory with 25 years of manufacturing experience in beverage machinery. Located in Jinfeng Town, Zhangjiagang City, Jiangsu Province, China. The transportation is convenient, very close to Pudong Airport and Sunan Shuofang Airport. If your itinerary includes a factory visit, we will pick you up. Q: How long is your delivery cycle after you order the machinery? A: Generally it is 40 working days. Q: Do you have a relevant after-sales system? A: We have a Perfect after-sales system. 1: 12 months warranty. 2: Many-to-one service, we will solve basic problems through phone, email, whatsapp, WeChat and video calls. The operation manual will be sent with the machine or via e-mail. 3: If conditions permit, the engineer will go to the buyer's factory to install and test the machine, and train the buyer's staff on how to operate and maintain the machine. Q: If I want to buy a machine, what information do I need to tell you? A: 1: What liquid do you want to fill? 2: What is the capacity and height of the bottle? 3: What is the output in one hour? 4: Related water quality analysis reports, etc. 5: Required mechanical voltage Q:How to ensure that you deliver goods on time and ensure the safety of my funds? 1:We guarantee the on-time delivery and quality of the equipment you purchase through the credit insurance service of the Alibaba platform. 2:With the letter of credit, you can easily lock in the delivery time. 3:After visiting the factory/video watching the factory, you can ensure the authenticity of our bank account. Q:How do you ensure the quality of the machine? 1:To ensure the accuracy of parts. We are equipped with a variety of professional processing equipment, plus professional processing methods accumulated over the years. 2:Before the machine is assembled, each part is inspected by the inspector. 3:Assemble machines, all with masters with more than 5 years of work experience to operate. 4:After all the equipment is completed, we will connect all the machines and allow at least 12 hours for a complete production line. To test its stability
For more information,please contact us.