10000~600000m3 aac block and panel production line
Light weight aac autoclave aerated concrete block brick making machine line
Main raw materials of AAC are siliceous material (sand, fly ash and Silicon tailings) and Calcium materials (lime and cement) mixed with foaming agent (aluminum powder). It is the product of light porous silicate through the following processes: batching, mixing, pouring, hardening, cutting, autoclaving and curing etc. Because of large amount of well-distributed tiny pores after foaming, it is named autoclaved aerated concrete.
AAC Classification :
In general, it can be classified according to the types of raw materials, manufacture process and functions. Based on the shape of AAC products, it can be divided into: AAC blocks and AAC panels. It is a revolutionary material offering an unique combination of high durability and strength, low weight, excellent heat insulation, fire resistant, noise absorption, unprecedented build ability and superior ecological green features. In China, AAC is one of the light wall materials which was popularized and applied at the earliest and the most widely.
1. raw material preparation:
Using reversal crane carry the mould and block to demould on cutting cart. The cutting cart will take the block to level cutting machine,vertical cutting ,two sides cutting,and remove the top waste material.
5. Autoclaved
Finished cutting using semi-product crane carry to the front of autoclave grouped,hoisting machine or dragger will drag steam trolley into autoclave to steam,it need 10-12 hours.
Using finished block carry hanger clamp the finished product to package line on wooden pallets,after package, then by forklift transport the finished products to piled yard according to specifications to stack.
Main Equipments in AAC Production Line:
The normal production capacity:
Annual Capacity ( 300days ) |
Power |
Daily Capacity |
Cycle Time |
No. of Autoclaves |
plant area (m2) |
50,000m ³ /year |
400KW |
166 m ³ /day |
8 hours |
2 |
2000 |
100,000m ³ /year |
500KW |
333m ³ /day |
8 hours |
4 |
2000 |
150,000m ³ /year |
630KW |
500m ³ /day |
8 hours |
6 |
2500 |
200,000m ³ /year |
720KW |
666m ³ /day |
8 hours |
8 |
3000 |
300,000m ³ /year |
1186KW |
1000m ³ /day |
8 hours |
6(D2.85*32.5) |
3500 |