51afb97c0f783325b4c2f705fe996f0d.jpg
13025249a7b83a769817b6b3ce5420c9.jpg
88f1dfc2bf6e3fb49b7b47a0ee77cf31.jpg
59e750f9dac9379099812cb45cac0e1c.jpg
NaN / 0

pre fab 20 Ft 30Ft Sale Used Shipping Home Ready To Move In Storage Container House

Get Latest Price
US$ 1799
≥1 Sets
US$ 1789
≥25 Sets

Quick Details

Place of Origin:
Shandong, China
Brand Name:
DINGRONG
Name:
living container house
Keyword:
container office 20ft 40ft house
Product Details
Product Description

Container Engineering ReportTechnical conditions

1.1 General Technical Condition
1)The structure can prevent the 8 magnitude earthquake.
2)The design of seismic grouping is the first group, the site characteristic cycle is considered 0.45s, the construction site
category is considered by Class III, and the damping ratio of steel structure is 0.05. The maximum αmax of the horizontal
earthquake influence coefficient is 0.04, which is calculated by 5 years.
3) Structural safety level is grade 2. The coefficient of importance is 1.0.
4) Conner fitting elevation plus or minus zero.

1.2 Materials
Normally,steel beams, steel columns, purlin are all used Q235B cold bending galvanized light steel.
strength of steel:f=215N/m2

1.3 Loading Combination
1.Calculation of floor Loading
(1)Bottom Flooring
Structure Weight 0.4 kN/m2
Dead Load Value 0.4 kN/m2
Live Load Value 3.0 kN/m2
(2)Roof board
Structure Weight 0.3 kN/m2
Dead Load Value 0.3 kN/m2
Live Load Value 0.5 kN/m2

2.Calculation of Wind loading
According to the 15 Design durable years, the basic wind pressure of wind loading is W0=0.3KN/m2
beam
2.2mm thickness galvanized frame+powder coating
column
2.3mm thickness galvanized frame+powder coating
wall
50mm thickness EPS sandwich panel
roof
steel sheet+75mm thickness glass wool insulation+steel ceiling
floor
MGO board
door
steel security door
window
pvc sliding window
FRAME IS AS FOLLOWS
VR
ADVANTAGE OF OUR CONTAINER HOUSE
1.CONTAINER CORNER
the container corner is welded by steel plate,so there are many welding points,although most of the supplier will do powder
coating,the powder coating can not cover every welding points,half a year later,the corner will get rusted
our company does electroplating for the corner fistly,then do powder coating,this way makes it anti rust
2.WINDOW AND DOORS
3we are using higher quality windows and doors,there are very cheap windows and doors in the market.we will not use these,because
they are very fragile

other suppliers window and door

ours window and door

3.most of the supplier are using common type MGO board,it is not very strong and not good for waterproof.our MGO board is with
cement inside,it is new type subfloor material,strong and good for waterproof.

4.we are using higher quality sandwich panel,outer skin 0.4mm thickness,and some suppliers will use sandwich panel with double
skin 0.3mm(although some supplier said their sandwich panel uses 0.3mm steel sheet,the exact thickness of the steel sheet is just
0.25mm,it is very thin,and can be easily damaged by a thief)

5.our column is made by bending machine which make the holes exact,and easy to install.now most of the supplier are making the
column by cold forming machine,sometimes the holes are not exact,and hard to install

6.our bottom secondary beam is 14pcs(the space between two beams is around 380mm,the floor will not shake greatly),and most of the
suppliers will use 9pcs(the space between two beams is around 570mm,the floor will shake greatly)

7.our frame without powder coating is 2.3mm,some supplier’s thickness is just 1.8mm,so they need to add support beam in the
middle,the beam is thin,if without the support beam,the house will collpapse.
we have many models and designs of container house as follows.but it is not full,if you want the full catalogue,please contact us
Packing & Delivery

package for full container(FCL) order.

we will weld steel pallet,and load all materials on top of the pallet,then wrap plastic film.easy to load and unload,it is also a good way to protect the materials.our this kind package will increase around USD 70 cost per
house.
for shared container(LCL) order
we will make the wooden box to protect the materials
other suppliers usually load the materials pieces by pieces in container,to unload 1*40HC container,4 workers usually take one
day.and the materials are easy to be damaged.