0556898053f739af9284a728b17f66d5.jpg
5b6563c5133d330ba3f1480bdb8d0db9.jpg
f6fcbb2c8d6b3bfb8f8240dae05075fa.jpg
a42e368cda8a32ce8970e2741d353abc.jpg
NaN / 0

Hot sale hand scraped UV finished golden acacia hardwood flooring

Get Latest Price
US$ 55.55
≥2 Square meters
US$ 53.33
≥501 Square meters
US$ 51.95
≥1001 Square meters

Quick Details

After-sale Service:
Online technical support, Onsite Installation, Onsite Training, Onsite Inspection, Free spare parts, Return and Replacement, Other
Project Solution Capability:
graphic design, 3D model design, total solution for projects, Cross Categories Consolidation, Others
Application:
Villa, Apartment, Hotel, Office
Design Style:
Modern
Product Details
Hot sale hand scraped UV finished golden acacia hardwood flooring
Hot sale hand scraped UV finished golden acacia hardwood flooring
Hot sale hand scraped UV finished golden acacia hardwood flooring
Hot sale hand scraped UV finished golden acacia hardwood flooring
Product Paramenters
Product Name
Solid wood flooring
Usage
Home decoration, Shopping center, Hotel, Restaurant, Ball hall, etc
Thickness
18mm
Color
Sample
Installation
Lock by Lock
After-sales service
Online Technical Support

1. How to solve the quality problems after sales?

Take photos of the problems and send to us. We will make a satisfied solution for your within 24 hours after we confirm the problems.

2. What can be done if products are damaged when I receive them?

Don't worry. If it is an item that is easily damaged, we will generally add a small amount of add to the order to prevent it from being insufficient. In addition, if we are responsible for logistics, we will compensate the person charge and compensate the customer.

3. How do you control the quality?

We have our own QC team. Each products will be checked and take photos before packing.

4. What is your term of packing?

Usually different products have different packing methods. Commonly used packing methods include wooden box packaging, wooden pallet earning and packaging.

5. How long does the delivery time usually take?

Generally speaking, we can complete the production within 25-30 days after confirming the order, but the specific needs depend on the actual situation.