71d681af61f53cadaac0d55c0ca1f015.jpg
5c93dfdd2284398cbd5a2e0ff76b0be5.jpg
746b4a723e07380d979e21c21e183417.jpg
5d638cc2cf55381cbd11b9ca0ce79ccf.jpg
NaN / 0

Catering equipment commercial food warmer set cold beverage plastic soda water drink fruit juice dispenser machine for fridge

Get Latest Price
US$ 62.9
≥2 Pieces
US$ 49.9
≥200 Pieces
US$ 39.9
≥2000 Pieces
US$ 14.9
≥50000 Pieces

Quick Details

Place of Origin:
Guangdong, China
Brand Name:
ROMCAPER
Model Number:
HT22110801
Product name:
juice dispenser
Product Details

Catering equipment commercial food warmer set cold beverage plastic soda water drink fruit juice dispenser machine for fridge

Item No. HT22110801
Product name Drink dispenser
Main Material Stainless steel + PC/PE
Package Color box or Custom
Lead time RTS Order: Within 15 days
Customization Order: 30-50 days, pls contact us for details.
OEM & ODM Yes, pls feel free to contact us!
Product Feature

[1] STEADY-FLOW NOZZLE releases the liquids at the perfect speed. It is slow enough to avoid spills but fast enough that your guests won't be stuck in line waiting to fill up their drinks.


[2] The beverage dispenser is very suitable in almost any situation, the supply of tea, lemonade, fruit juice, or Sangria.


[3] Suitable for luxury hotels, restaurants, bars,cold drinks, banquet ,party and other entertainment venues.

[4] Anti-scalding, anti-leak faucet handle design, no fading, no water leakage, beautiful appearance, safe use.

[5] Material: Safe and safe PC/PE and stainless steel for easy cleaning.

  • Q1: CAN I GET A SAMPLE?
  • A1: Yes, please let me know which item you are interested and also the consignee information. Sample charge is refundable when order is up to certain quantity.
  • Q2: WHAT IS YOUR MOQ?
  • A2: 50pcs for existing item, 300pcs for light customization, please kindly confirm with account manager for details.
  • Q3: WHETHER YOU COULD CUSTOMIZED PRODUCT?
  • Own factory, customization is always welcome, such as logo & package, label, and also assemble the product set.
  • Q4: HOW LONG IS THE PRODUCTION LEAD TIME?
  • A4: In general, it takes about 3-7days for the sample, and 15-30days for the mass production. Large production capacity we have, which can ensure fast delivery time.