de7ce8257bc53ee791d93ff73d65ee35.jpg
1f1b1c4cbf4638e6aa109ef6f96556c3.jpg
a6ab5fc3a9d7350a910c7adb87829162.jpg
910cdd2960993c729884aef4575f4ad9.jpg
NaN / 0

Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize

Get Latest Price
US$ 680
≥1 Pieces
US$ 600
≥2 Pieces

Quick Details

Structure:
Tube Heat Exchanger
Voltage:
220-380V
Core Components:
Fin tube
Place of Origin:
Guangdong, China
Product Details
Boiler Economizer Heat Exchanger
Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize
Flue gas waste heat recovery is a kind of energy-saving equipment that recovers the heat of high temperature gas in industrial production. Its working principle is also heat exchange. High temperature gas heats low temperature liquid and gas through high efficiency heat exchange equipment and low temperature liquid and gas high efficiency heat exchange, which reduces the temperature of flue gas and saves energy consumption. It is widely used in boiler flue gas heat recovery, aluminum smelting furnace flue gas heat recovery and hot air heat recovery at high temperature.

Main Features
The product are customized for different airwateroilboilersteam heating and other industrial.After investigating and feedbacks by customercharateristics as following:
1、Seamless heat transfer elementhigh-pressure-resistant ability.
2、Even internal flow fieldno dew-point corrosion.
3、Make the boiler heat efficiency to improve greatly.

Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize

Number Flue gas
volume
(m³/h)
Flue gas
temperature
drop(℃)
Water
flow
(T/h)
L
(mm)
H
(mm)
W
(mm)
D
(mm)
D1
(mm)
interface Recovery
of heat
(kW)
Saving
natural
gas
(m³/h)
1 ≤970 280℃-130℃ 1 480 530 580 380 300 DN25 50 5.4
2 ≤1463 280℃-130℃ 1.5 580 530 580 380 300 DN32 75 8
3 ≤1950 280℃→130℃ 2 680 670 580 480 400 DN32 100 10.8
4 ≤2925 280℃-130℃ 3 780 810 580 480 400 DN40 150 16
5 ≤3900 280℃→130℃ 4 880 950 580 580 500 DN40 200 21.5
6 ≤4225 280℃-130℃ 5 980 950 600 580 500 DN50 215 23
7 ≤5444 280℃-130℃ 6 980 1020 600 680 600 DN50 275 29.6
8 ≤7259 280℃-130℃ 8 1080 1160 600 780 700 DN50 365 39
9 ≤9073 280℃-130℃ 10 1280 1230 600 880 800 DN50 455 49
10 ≤10888 280℃-130℃ 12 1380 1370 600 980 900 DN50 550 59

Flue Gas Heat Recovery Heat Exchanger Boiler Energy Saver Coal-fired Boiler Economizer with Stand Customize

Packaging & Transportation

FAQ

Q1: Can I place a sample order?
A1: Yes, we welcome sample order to test and check quality.  Mixed samples are also
acceptable. Please contact our sales for a stock list.

Q2: What about the lead time?
A2: A sample order requires 3-5 days;  mass production time 2-3 wecks, depending on the order quantity & styles.

Q3: Do you have any MOQ for custom order?
A3: Yes, we do have a MOQ for custom designs.  It depends on the specific designs.  So please contact us for more details.

Q4: What services can we provide?
A4: Delivery Terms: FOB,CFR,CIF,EXW.
Payment Currency:USD,EUR,AUD,HKD,CNY;
Payment Type: T/T,MoneyGram,Credit Card,PayPal,Western Union,Cash,Escrow;

Q5: How is an order processed?
A5: 1.  Please give your requirements.
2.  We quote according to your requirements or our suggestions.
3.  We provide a proforma invoice with your agreement.
4.  We proceed your order or pre-production sample after your payment.

Q6: How to ensure your payments?
A6: Our payment terms is 30% deposit T/T before production, 70% balance before shipping, we accept T/T payment. The contract we signed will have detailed policies which will ensure your rights, if you want to add any others, please feel free to talk with us.

Q7: What's the warranty? Is it really 3 years?
A7: Different products with different usage, as long as the product is used in the right place and following the instruction book, we have confidence that it can work continuously at least 3 years and more.

Contact Us