CD/MD Electric Hoist
|
|
|
|
|
|
|
|
|||||||
Lifting weight(t)
|
|
|
1T
|
2T
|
3T
|
5T
|
10T
|
|||||||
Lifting height(m)
|
|
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
|||||||
Lifting speed (m/min)
|
|
|
88/0.8
|
88/0.8
|
88/0.8
|
88/0.8
|
77/0.7
|
|||||||
Running speed(m/min)
|
|
|
20
|
20
|
20
|
20
|
20
|
|||||||
Bonding number(n/hr)
|
|
|
120
|
120
|
120
|
120
|
120
|
|||||||
Wire rope
|
|
Diameter
|
7.4m/m
|
11mm
|
13mm
|
15mm
|
15mm
|
|||||||
|
|
Structure
|
D-6*37+1
|
D-6*37+1
|
D-6*37+1
|
D-6*37+1
|
D-6*37+1
|
|||||||
I-beam models
|
|
|
16-28b
|
20a-32c
|
20a-32c
|
25a-45c
|
32a-63c
|
|||||||
Motor
|
Hoist
|
Power
|
1.51.5/0.2
|
3 3/0.4
|
4.54.5/0.4
|
7.5 7.5/0.8
|
13 13/2.0
|
|||||||
|
|
Speed
|
1380
|
1380
|
1380
|
1400
|
1400
|
|||||||
|
Oper
ation |
Power
|
0.2
|
0.4
|
0.4
|
0.8
|
0.8
|
|||||||
|
|
Speed
|
1380
|
1380
|
1380
|
1380
|
1380
|
|||||||
Type of work
|
|
|
M3
|
M3
|
M3
|
M3
|
M3
|
|||||||
Institution level
|
|
|
25%
|
25%
|
25%
|
25%
|
25%
|
HC/HM Electric Hoist
|
|
|
|
|
|
|
|
|||||||
Lifting weight(t)
|
|
|
16T
|
20T
|
25T
|
32T
|
50T
|
|||||||
Lifting height(m)
|
|
|
9/12/16/18/20/24/30/35/40/45
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
6/9/12/18/24/30
|
6/9/12/18/24/
30
|
|||||||
Lifting speed(m/min)
|
|
|
6(6/0.6)
4.2(0.42/4.2)
|
3.3(0.33/3.3)
4.2(0.42/4.2)
|
3(0.3/3)
|
3(0.3/3)
|
2.4(0.24/2.4)
|
|||||||
Running speed(m/min)
|
|
|
18
|
14
|
18
|
16
|
20
|
|||||||
Bonding number(n/hr)
|
|
|
120
|
120
|
120
|
120
|
120
|
|||||||
Wire rope
|
|
Diameter
|
26/17.5mm
|
21.5mm
|
21.5mm
|
26mm
|
15mm
|
|||||||
|
|
Structure
|
6*37
|
6*37
|
6*37
|
6*37
|
6*37
|
|||||||
-beam models
|
|
|
50a-63c
|
56a-63c
|
56a-63c
|
>63c
|
32a-63c
|
|||||||
Motor
|
Hoist
|
Power
|
18.5(2.2/18.5)
|
18.5(2.2/18.5)
|
18.5(2.2/18.5)
|
18.5(2.2/18.
5)
|
1313/2.0
|
|||||||
|
|
Speed
|
960
|
1400
|
1400
|
960
|
1400
|
|||||||
|
Operati
on |
Power
|
0.8*4
|
0.8*4
|
0.8*4
|
0.8*4
|
0.8*4
|
|||||||
|
|
Speed
|
1380
|
1380
|
1380
|
1380
|
1380
|
|||||||
Type of work
|
|
|
M3
|
M6
|
M6
|
M6
|
M6
|
|||||||
Institution leve
|
|
|
25%
|
25%
|
25%
|
25%
|
25%
|