b1a77f27791430569551664f37882e46.jpg
f233ad79239032648678f325aab322a2.jpg
261b4dba7d5034fc871edafb21a53a81.jpg
dd95575bed9f3f34b65ef34f3ff424af.jpg
NaN / 0

diy steel frame garage prefab steel structure car parking sun shed building for sale

Get Latest Price
US$ 35
≥200 Square meters
US$ 26
≥500 Square meters
US$ 19
≥1000 Square meters

Quick Details

Grade:
Q235 Q345 Low Carbon Steel
Tolerance:
±5%
Place of Origin:
Henan, China
Brand Name:
Dongrui
Product Details

Steel Structure Building
1. Main Framing
Welded/ Hot rolling H section column and beam
Column
Q235, Q355B H section steel
Beam
Q235, Q355B H section steel
2. Secondary Framing
Purlin
Q235B Z and C sections purlin
Knee brace
Q235B angle steel, galvanized
Tie bar
Q235B round steel,painted
Bracing
Q235B round steel, galvanized
3. Roof and Wall panels
Steel sheet and insulated sandwich panels
Single steel sheet
0.5/0.6/0.7 color steel sheet
Sandwich panel
EPS/PU/Fiber glass wool/ rock wool sandwich panel
4. Steel Decking Floor
V-688 Decking floor
5.Structural subsystem
Canopies, Fascias, Partitions, etc.
6.Mezzanines, Platforms
H beam
7.Other Building Accessories
Sliding Doors, Roll Up Doors, Windows, Louvers, etc.

The Advantage

- Custom size and color-light weight, high strength

- Easy assemble, short construction period

- Reusable, easy move, low cost

The steel structure buildings is a customized product. no matter small or large building, our engineers will help you design it.

Three ways to help you on the installation:


1. We can offer you the manual include the photos and drawings, or some videos for help you
on the installation. And you willorganize the local people to install it.
2. We can send our people to your site to guide your people to install.
3. You can send your people (engineers or the technician) to our company to study the
installation details.

Q:  You are manufacture factory or trading company?

A:  We are a factory. You are welcomed to visit us at any time.The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.

Q:  Is your price competitive compared with other companies?

A:  Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.

Q:  Can you send engineers or whole team to install my project?

A:  We will give detailed installation drawings for free. We can send engineers as installation director or a team upon request.

Q:  Do you accept container loading inspection?

A:  You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q:  Do you offer designing service for us?

A:  Yes, we offer full set of drawing as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.

Q:  What is the lead time?

A:  Lead time depends on order quantities. In general the delivery time to nearest seaport in China will be 40 days after receiving deposit.

Q:  How can you get a quotation for your projects?

A:  You can contact us by email, phone, Alibaba TM, WhatsApp, Skype, Viber and so on 24*7 and you will get reply within 8 hours.

Dear Customer If you have drawings, welcome to share drawings with us, quotation will be done based your drawings. Our excellent design team will design the steel structure building for you. If you give the following information, we will give you an satisfactory drawing.

1 Location (where will be built? ) which country? which city?

2 Size: Length*width* Eave height _____mm*_____mm*_____mm

3 Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s

4 Snow load (max. Snow height) _____kn/m2, _____mm, temperature range?

5 Anti-earthquake _____level

6 Brickwall needed or not If yes, 1.2m high or 1.5m high? or other?

7 Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.

8 Door quantity & size _____units, _____(width)mm*_____(height)mm

9 Window quantity & size _____units, _____(width)mm*_____(height)mm

10 Crane needed or not If yes, _____units, max. Lifting weight____tons; Max.Lifting height _____m.