Basic Parameter
|
|
|
||
No.
|
Component
|
Description
|
||
0
|
Size
|
20/40 foot, can be fully customized
|
||
1
|
Main Steel Structure
|
2.5-3.0mm galvanized steel structure, c purlin, square tube, angel steel, etc.
|
||
2
|
Roof Tile
|
Container Plate, sandwich panel
|
||
3
|
External Wall Panel
|
100mm glass wool panel (can be customized, such as EPS, rock wool, PU for insulation material)
|
||
4
|
Door
|
Sliding door, security door, sandwich panel door(Can be customized)
|
||
5
|
Window
|
Aluminum alloy Sliding Window, blind window (Can be customized )
|
||
6
|
Flooring
|
Mgo board, Laminate floor, Plywood (Can be customized )
Fireproof & waterproof
|
||
7
|
Ceiling
|
Metal ceiling plate (Can be customized )
|
||
8
|
Electrical Installation
|
Circuit hidden installation, 3C/CE/CL/SAA Standard,with distribution box, lights, switch, sockets, etc.
|
||
Technical Parameter
|
|
|
||
No.
|
Description
|
Specification
|
||
1
|
Bearing Load
|
150kg/square meters
|
||
2
|
Wind Pressure
|
0.45KN/square meters Equal 10 Grade
|
||
3
|
Earthquake Resistance
|
7 Grade
|
||
4
|
Temperature Resistance
|
-25°C to 50 °C
|
||
5
|
Life Span
|
More Than 40 years
|
||
6
|
Optional Accessories
|
Furniture, sanitary, kitchen, A/C, electrical appliance for accomodation, office, dormitory, toliet, kitchen, bathroom, shower, steel roof, cadding panels, decorative material, etc.
|
||
7
|
Advantage
|
(1) Fast installation: 2 hours/set, save labor cost;
(2) Anti-rust: all material use hot glavanized steel; (3) Waterproof: without wood ceiling,wall; (4) Fireproof:Fire rating A grade (5) Simple foundation:just need 12pcs concrete bolck foundation; (6) Wind-resistant(11 level) and anti-seismic(9 grade) |
How to order?
|
|
|
Step 1
|
Tell us your requirements
|
|
Step 2
|
Quotaion will be sent based on your requirement. Solution will be recommended to you as the alternative
|
|
Step 3
|
Negotiate and confirm each details for goods, trading terms and so on, get agreement and sign contract.
|
|
Step 4
|
Advanced payment and production
|
|
Step 5
|
Factory Examine Goods/ rectify and reform to meet the requirements of contract.
|
|
Step 6
|
Balance payment and shipping
|
|
Step 7
|
Handing Shipping files to help clients get goods from transporter in time.
|
|
Step 8
|
Clients get goods and go into warranty time.
|