Higher quality Z145K1 Metal Casting Moulding Equipment Sand Jolt Squeeze automatic green sand molding machine

Get Latest Price
US$ 9000
≥1 Sets

Quick Details

Place of Origin:
Shandong, China
Machine Type:
Casting molding
Warranty of core components:
2 Year
Brand Name:
HSDZJ
Product Details
Higher quality Z145K1 Metal Casting Moulding Equipment Sand Jolt Squeeze automatic green sand molding machine
Higher quality Z145K1 Metal Casting Moulding Equipment Sand Jolt Squeeze automatic green sand molding machine
Higher quality Z145K1 Metal Casting Moulding Equipment Sand Jolt Squeeze automatic green sand molding machine
Higher quality Z145K1 Metal Casting Moulding Equipment Sand Jolt Squeeze automatic green sand molding machine

I. Introduction of the machine Z14 series micro-vibration compaction molding machine is the most common molding equipment for green sand casting. The whole machine is composed of fuselage, jolt mechanism, sand adding mechanism, indenter, mold drawing mechanism and control system. The size of the sand mold can be selected from 300-1200mm, which can meet the use of common castings. Suitable for medium and small manual and semi-mechanized casting workshops. Working process: When modeling, first pull away the upper pressure plate, put the sand box on the template frame of the workbench (sometimes need to put the auxiliary frame). Then fill in the molding sand. When the sand is filled, the jar cylinder can also be activated to produce a jolt, so that the molding sand edge is filled in, and the edge is initially compacted. At this time, the pressure plate is turned back to the central position relative to the sand box, and then the compacted cylinder is started, so that the workbench and the sand box rise together, the pressure plate is pressed into the auxiliary frame, and the molding sand is compacted. When the table rises, the four ejector rods rise together, when the table falls, the four ejector rods cannot fall by the top, and the sand box is held up, so the shape comes out from the sand mold. At this time, the sand has been tightened and can be removed. Then make the drawing rod drop, the molding machine back to the starting state, and the molding completes a cycle. Ⅱ. The advantages and disadvantages of the machine: 1. Advantages: ① For small parts with various degrees of complexity, it can meet the process requirements; ② The machine structure is compact and simple. Easy maintenance, good rigidity; ③ Dust cover is used everywhere on piston and guide rod. 2. Shortcomings; ① small compression force, large percussion noise, high labor intensity; (2) Using the distribution valve sequence control, it is impossible to repeat a certain intermediate process, and it is impossible to carry out a certain process alone, which brings trouble to the operation and maintenance; ③ The drawing cylinder and the drawing frame require high parallelism, which brings difficulties to installation and adjustment.
Model
Z145K1
Z146K
Z148C
Z148D
Z1410E
Z1410Ec
Z1412
Maximum size of sand mold (mm)
500×400×200
630×500×250
800×600×250
800×630×350
1000×800×350
1000×800×450
1200×1000×400
Mold opening stroke (mm)
200
250
230
350
350
450
400
Compaction stroke (mm)
170
180
130
180
200
200
200
Jolting capacity (kg)
300
400
400
600
1350
1500
1700
Compacted piston diameter (mm)
380
420
550
570
650
700
800
Vibrating cylinder diameter (mm)
150
200
230
230
360
400
420
Distance from pressure plate to jolt table (mm)
568
498
550
630
794
900
900
Mechanized productivity (box/h)
60-80
60
60
60
50
50
50
Overall dimension (mm)
950×600×1680
1080×700×1988
1730×900×1980
1335×975×2050
1765×1231×2620
1360×1530×2765
1740×1530×2975
Machine weight (kg)
1480
1570
3800
5000
7600
7000
10000
Q1 How to choose the right size machine?

A1Tell us the process and parameters, we help you select the type.

Q2
Can the machine be customized?

A2 We will provide the most appropriate solution.

Q3
How to debug equipment?

A3 The debugging of the equipment is completed before leaving the factory. PLC has remote debugging function, and engineers cancome to your factory for debugging.

Q4How to install the complete set of equipment?

A4 We have a number of professional installation teams, can provide overseas installation services, engineers can also come to you to guide the installation and commissioning.

Q5
How long is the warranty? What does it contain?

A5 Warranty period of one year, one year non-human damage of the main parts free replacement, not including consumer parts.