Thailand prefabricated house modular kit homes thailand prefab house
1 Prepare a concrete foundation,
we will provide a professional drawing for you. Only 5-10 business day you can fast and easy completed the foundation, and then we can get start build a camp !
2-3,Follow our instruction drawing, install the structure, pure screw bolting connection, easy and super fast establish a structure, if you build a 2 floor building, also make a first floor base.
4.After the structure is completed, if 1 floor building, please check the next step, if 2 floor building, now will install the first floor flooring. See? easy to install.
5. Install the roof structure.
fast ! fast ! fast ! finished ! If you build a 2 floor building, you can pre-install the roof first, and then use a crane transport the roof structure. The whole structure is completed !
6-7. Install the wall panel, install the inside door, window, and electrical system. This system is really easy! After you see our professional drawing, you will understand! 2 people, 1 day can install more then 250 SQM wall panel.
8. The last step, if equip a toilet or bathroom, we will also provide drawing for you. If schedule make a kitchen, no worry, every step we have engineer show you how to install !
Finally, completed installation, enjoy staying!
Moneybox Prefab House
Prefabricated house (prefab house) is made of light steel as steel structure and sandwich panels for wall and roof. The insulation of sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass. As a standardized construction product, it has below main features: Dry installation, no construction garbage caused; Environment protective materials adopted, repeated use and low cost; Flexible size and easy to assemble and disassemble with elegant appearance; Safe and durable .It is suitable for temporary buildings such as dormitory, canteen, recreation room, washing room, etc...
Technical Parameter of standard prefabricated house
1. Wind resistance: Grade 11(wind speed≤111.5km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.5kn/m2
3. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
4. First floor load capacity: 150 kg/m2
5. Live load of corridor is 2.0kn/ m2
6. Four skilled workers can finish installation of 100sqm in 8 hours for the light steel structure.
7. Most components of the house are recycled, so the shelf life is over 20 years without any building garbage.
8. We can design and produce the house according to customer’s request.
9. We can provide the service of installation, supervision and training by extra.
Luxury Prefab House with solar panel system, friendly economic camp for our client.
We spend 15 days, help our client fast build 2 block, 2 floor totally 60 rooms worker camp, which can fit 100 worker live inside.
Flat Roof Worker Dormitory, this is our 2500 SQM project
From design, to production, to install, to after sales, we are the top 10 in China!, Privide 1 stop solution for you!
Saudi Arabia Prefabricated Camp with Bathroom and Toilet