Number
|
systematic name
|
Product name
|
Model
|
Qty.
|
||||
15000 bottles/hour can beer filling and packaging production line
|
|
|
|
|
||||
1.
|
Automatic Cans unloading system
|
Automatic Depalletizers
|
15000 C/H
|
1SET
|
||||
|
|
including cans outlet platform
|
|
|
||||
2
|
Cans washing system
|
Automatic Empty can spray washing machine
|
XG-150
|
1SET
|
||||
3.
|
Filling system
|
Automatic filling and sealing machine
|
DY50-6
|
1SET
|
||||
4.
|
Sterilization system
|
Pasteur spray sterilizer
|
WP-12000
|
18m
|
||||
5.
|
|
Plate heat exchangers
|
20㎡
|
3SETS
|
||||
6.
|
Drive system
|
Linear conveying
|
SS-1
|
150m
|
||||
7.
|
|
90° curve conveying
|
SS-2
|
10 pcs
|
||||
8.
|
|
Carton conveying
|
ZSS-1
|
10m
|
||||
9.
|
|
Power head
|
matching
|
10pcs
|
||||
10.
|
|
Can tipper
|
matching
|
2SETS
|
||||
11.
|
Automatic packing system
|
the Can body blow dry machine
|
CG-1
|
1SET
|
||||
|
|
Small character inkjet printer
|
laser
|
1SET
|
||||
|
|
Automatic carton packing machine
|
XB-25
|
1SET
|
||||
12.
|
|
Large character inkjet printer
|
ink
|
1SET
|
||||
13.
|
Palletizing winding system
|
automatic palletizer
|
MD-25
|
1SET
|
||||
14.
|
|
Tray conveying
|
TSS-1
|
8m
|
||||
15.
|
|
Automatic winding machine
|
CRJ-25
|
1SET
|
||||
17.
|
Auxiliary equipment
|
|
|
|
||||
18.
|
Low pressure screw air compressor + trachea, joint
|
Demander's responsibility (supplier can provide)
|
|
|
||||
19.
|
Steam boiler + steam pipe, steam filter, insulation cotton, pressure reducing valve, etc
|
Demander's responsibility (supplier can provide)
|
|
|
||||
20.
|
Utility piping
|
|
|
|
||||
21.
|
Cables, bridges, etc. between the total electrical cabinet in the demand workshop and the sub-cabinet of the supplier equipment
|
Demander's responsibility (supplier can provide)
|
|
|
||||
22.
|
Other description
|
|
|
|
||||
23.
|
Installation and commissioning cost
|
A person who goes abroad to debug is 250 US dollars a day, and the needing party is responsible for the cost of round-trip air
tickets, visas and food, accommodation and travel during commissioning。 |
|
|
||||
24.
|
|
The required party prepares the tools, consumables, etc. required during commissioning.
|
|
|
||||
25.
|
Consumables
|
Free one-year consumables are provided, after one year at cost
|
|
|