Voltage(V) | 220-240V | Power(W) | 1950W |
Steam generated time(s) | 50's | Steam flow(g/min) | 55g/min |
Working time(min) | 55minutes | Water capacity(L) | 3L |
Cable length(M) | 2.2M | Hose length(M) | 1.70M |
Pole material | Stainless steel | Pole adjustable length(M) | 1.75M |
Boiler material | Titanium Aluminum alloy | Ironing head material | PA6+PA66+Aluminum |
Removeble water tank(Y/N) | Y | Steam control | Two power level,switch control panel |
Alarm for lack of water | N | Function | Iron garment,trousers,curtain,sheet,doll |
Protection system | Y | Accessories | Brush,pants clips,fold hanger,stainless steel pole |
Loading quantity(20'/40'/40HQ) | 20':510pcs/40':1050pcs/40HQ:1245pcs | Aprroval certificate | CQC,CE,CB,Rohs,REACH |
Sample leadtime | One week | Packge | 1pc/GB,3pcs/1CTNS |
CB size(mm) | 830mm*270mm*440mm | MC size(mm) | 830mm*430mm*465mm |
CB N.W.(kgs) | 22.2kg | MC N.W.(kgs) | 18kg |
1. If I want to put my brand on packing and products, what is the order quantity, is there any upcost?
There is no upcost for customized packing if the order quantity can meet MOQ
2. What is the nearest FOB port?
Ningbo
3. What certification you’ ve got for overseas markets?
We’ ve obtained CE/LVD,CE/EMC,GCC,CB,Rohs certification/test report for the products.
4. What is the delivery term?
It is always 25-30 days after the arrivals of L/C or 30% deposit payment.
5. I would like to know if ODM is acceptable.
Both OEM and ODM is acceptable
6. What is the nearest international airport if I would like to visit your factory?
Shanghai international airport is preferable.