The Most Asked Questions
|
|
|
|
|
||||
Q1: How can I customize?
|
|
|
|
|
||||
1) Please let us know your design ideas by photos, drawing, sketch, tech-pack, color painting.
2) We can provide you with fabric information. 3) In general, we will provide you with a direct quote, but for more complex designs, we will need to produce a sample before we can provide the appropriate price. 4) You will need to confirm with us the style color, size and other necessary details. 5) After you have paid through the link, we will start making the sample garment. |
|
|
|
|
||||
Q2: What is your custom MOQ?
|
|
|
|
|
||||
1) The MOQ for products such as T-shirts and tops is 50 pieces each, provided that no logo is required and only one fabric is used.
2) The MOQ is 100 pieces per model in 1 colour and 4 to 5 sizes.
3) Higher quality at a higher price. |
|
|
|
|
||||
Q3:Composition of Sample Fee
|
|
|
|
|
||||
1. Design Service Cost $30
2. Paper Pattern Cost $40 3. Fabric & Trim Cost $20 4. Stitching & Sewing Cost $30 5. Technology Support, $30. Such as print, embroider, emboss, tie dye |
|
|
|
|
||||
Pls note:
1. The sample fee $30 at front, include only design service. Due to system display rule, didn’t show other costs. 2. We charge $150/design+$35 freight first, but refund sample fee $150 as a coupon when you place bulk order above 100 pieces. you can use the coupon next sample, and revise 2nd time if want to revise something, you just still pay freight $35. we'll confirm all details before you place bulk order. |
|
|
|
|
||||
Q4: What is the production cycle?
|
|
|
|
|
||||
1) For simple designs, the sample production lead time is 5-10 days; for complex designs, the sample production lead time is 7-15 days.
2) Bulk production time, normally 20-30 days. For complicated designs, 30-45 days.
3) Please click below to view our sample process and bulk production process.
|
|
|
|
|
||||
Q5: What is the transport cycle like ?
|
|
|
|
|
||||
1) For sample:
By Express on Alibaba, 7-15 days, economic.
By UPS, DHL, FEDEX, 3-5 days, Fast timeframe.
2) For bulk production:
By airplane, 7-15 days.
By ocean ship, 35-45 days.
Special areas or periods will result in longer transport lead times.
|
|
|
|
|
||||
Q6: How we control the quality?
|
|
|
|
|
||||
1) Our quality is very high, you're assured to cooperate with us.
2) We through factory audit BSCI/ISO/WRAP and join in Sedex.
3) Automatic mechanized formwork processes and integrated assembly lines ensure standardized production
4) We inspect the goods during the production process and carry out a 100% inspection before packing.
|
|
|
|
|