Steel Structure Building Description |
main steel frame |
H section steel beam and columns, painted or galvanized, galvanized C section or steel pipe |
Secondary frame |
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc. |
Roof panel |
EPS sandwich panel,glass fiber sandwich panel, rock wool sandwich panel ,and PU sandwich panel or steel sheet |
Wall panel | Sandwich Panel or Corrugated Steel Sheet |
Tie Rod | Circular Steel Tube |
Brace | Round Bar |
Knee Brace | Angle Steel |
Roof Gutter | Color Steel Sheet |
Drawing |
We can make the design and quotation according to your require or your drawing |
Certification |
ISO9001:2000,CE. |
Materials |
Design Teams |
Canglong Group has an efficient, professional and high-quality team of designers. Team members have at least 15 years of experience in steel structure projects design in this industry.
The design team of Canglong Group adopts the international mainstream design software, and carries out design analysis in strict accordance with international standards in the design process of each project. While ensuring the safety, energy saving and high efficiency of buildings, it effectively reduces the material loss and waste of the project and ensures the economic design scheme of each project.
Packing and Shipping |
Fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the
rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile
up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.