Rubber Slippers And Tire Making Machine
Introduction
This machine is Mesa Structure,horizontal and double blades type,(Sigma “Z” blade),with jacket which can be added water for cooling.
All the Material which contact the product is SS304
The Kneading Pot through grinding and polishing near to the Mirror,Polish degree is 0.8
It is special equipment to mix,knead,crush,disperse,polyermerzing high viscosity material,with uniform mixing,without dead angle,high kneading efficiency feature.
1)It can be wid e ly used in BMC/DMC,High viscosity Silicone Sealant, Silastic, GlassCement,Chewinggum,Cellulose,Battery,Printing-ink,Dye,Resin,Plastic,Cosmetic,Pigment,Medicine Industry etc.
2)Material is mainly Stainless Steel or Carbon Steel.
3)Heating way with Steam Heating,Oil heating Electric heating.Water cooling system.
4)Discharging way is mainly Hydraulic Dumping valve,Ball Valve Discharge,Screw Extruder Discharge.
5)Three Main Type:Ordinary,Pressure Type,Vacuum Type.
6) different capacity : f rom Laboratory Scale to Mass Production. ( 2L-8000L )
Model |
NH-5 |
NH-40 |
NH-100 |
NH-300 |
NH-500 |
NH-1000 |
NH-1500 |
NH-2000 |
||
Volume(L) |
5 |
40 |
100 |
300 |
500 |
1000 |
1500 |
2000 |
||
PaddleAgitator(rpm) |
33,23 |
45,23 |
35,22 |
37,21 |
37,21 |
35,25 |
30,16 |
45,30 |
||
Major motor power(kw) |
0.75 |
2.2 |
4,5.5 |
7.5,11 |
15,18.5 |
22,30,37,45 |
22,30,37 |
45 |
||
Form of heating |
Steam:Pressure(MPa) |
0.3 |
||||||||
Electric heating:Power(kw) |
1 |
4 |
4 |
6 |
16.2 |
25 |
32.4 |
40 |
||
Degree of vacuum(MPa) |
0.094(vacuum kneader) |
|||||||||
Pressure(MPa) |
0.45(pressure kneader) |
0.35(pressure kneader) |
||||||||
Weight(kg) |
300 |
560 |
1250 |
1600 |
3000 |
4500 |
5800 |
6500 |
About Delivery time
Q-----What’s the delivery term for making business with us?
A-----Usually we send tne shipments in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.
About Lead Time
Q------What’s the lead time after placing thr order?
A------Usually it takes about 25~30 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
About Payment Term
Q------What’s the Payment Term?
A------By T/T in Advance, or Irrevocable L/C as Sight.