Introduction
As a new mature high-efficiency and low-pollution clean coal technology, circulating fluidized bed combustion (CFBC) technology has many advantages that other combustion methods do not have. Circulating fluidized bed combustion is low-temperature combustion, so the NOx emission is much lower than that of pulverized coal furnace, only 200ppm. CFBC can desulfurize directly during the combustion process, and the desulfurization efficiency is high. The technology and equipment are simple and economic, and the costs of its initial investment and operation are much lower than those of dry pulverized coal furnace and flue gas desulfurization (PC+FCD). The discharged ash residue has good activity and is easy to be comprehensive utilized without secondary ash residue pollution. The load adjustment range is large, and the low load can be reduced to about 30% of the full load.
Product thermal capacity: | 35-75 t/h |
Working pressure: | 1.25-5.3 MPA |
Outlet temperature: | 194-485 ℃ |
Available fuel: | Bituminous coal, anthracite, meagre coal, lignite, gangue, waste, sludge |
Available industries: | Chemical, food, tobacco, textile, printing and dyeing, feed, medicine, building material, wine, rubber, hospital |
Model
|
Rated Thermal Power t/h
|
Working Pressure MPA
|
Rated Output Water Temperature ℃
|
Thermal Efficiency %
|
DHX35-1.25-AⅠ
|
35
|
1.25
|
194
|
89
|
DHX50-1.25-AⅠ
|
50
|
1.25
|
194
|
89
|
DHX75-1.25-AⅠ
|
75
|
1.25
|
194
|
89
|
ZZ-35/3.82-AⅠ
|
35
|
3.82
|
450
|
89
|
ZZ-50/3.82-AⅠ
|
50
|
3.82
|
450
|
89
|
ZZ-65/3.82-AⅠ
|
65
|
3.82
|
450
|
91
|
ZZ-75/3.82-AⅠ
|
75
|
3.82
|
450
|
91
|
ZZ-75/5.3-AⅠ
|
75
|
5.3
|
485
|
91
|
1. How can you get the best price quickly?
(1) We need to know the boiler capacity, the fuel you plan to use and the steam pressure you need, and then we can confirm the boiler model.
(2) Customer needs to provide us your name, email address and company name, and then we will send you price list immediately.And if you use whatsapp, skype or wechat, you can provide us your ID, it will be more convenient for our communication.
2. Why should you believe our boiler quality?
(1).Strength calculation report with applied materials information;
(2).100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
(3).100% X-ray inspection( (Longitudinal, transversal safety inspection)): ensure the quality of entire boiler;
(4).Hydrostatic test: ensure the standard working pressure and safety;
(5).Third-party inspection report:By Jiangsu Boiler Inspection Institute;
(6).Passed ISO:9001 ,ISO14001,OHASA18001 and ASME(S and U) and A-class boiler certificate.
3. Quality warrantee
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
4. Quality warrantee
The seller guarantee quality of the machines for a period of 12 months from the date of trial run finish, but not to exceed 18 months from date on which the goods leave factory. If any parts (excluding easily damaging parts) are found defective in quality in the first year, the seller should replace free-of-cost.
5.Terms of payment
T/T 30% of total contract value as down payment;
T/T or L/C 70% of total contract value before delivery.
6.Claim
Any claims by the buyers regarding the machines shipped should be filed within 30 days after arrival of machines at the destination specified in the relative B/L and supported by a survey report issued by a surveyor approved by the sellers, otherwise the sellers shall refuse to consider. Claims in respect of matters within responsibility of insurance company and/or shipping company will not be considered by the seller.
7. What is the using life of your boiler?
A:Normally the boiler is designed for 20 years life span, but with right operation and good maintenance,the boiler can be used for 20-25 years.