273a801ff13e36acba4c647ccae99637.png
11171577d0203884ba3138c5a15b28e5.png
fbf56c46555831559f1d5d88dd9b55b9.png
3603e29cc27a3dc1a7317b0c13e36152.png
NaN / 0

Water Based Steel Structure Intumescent Fire Rated Fireproof Paint With Certificate

Get Latest Price
US$ 6
≥500 Kilograms
US$ 5.8
≥1000 Kilograms

Quick Details

CAS No.:
79-10-7
Other Names:
fireproof paint
MF:
C3H4O2
EINECS No.:
79-10-10
Product Details
Product Description

Product Introduction:

This product is water based fire retardant coating, non-toxic, odorless, good fire rated performance. High bonding strength, low cost and convenient construction etc. Covering on the steel surface. When meet with fire, expansion to form relatively thick and dense fire insulation layer. Thus play a role of fire protection of steel structures. Widely used in industrial plants, warehouses, high-rise buildings, stadiums, terminals, stations and other public places. Coated steel beams, steel columns, spherical grid surface play a good role in fire protection. If necessary, supporting the use of decorative finish to achieve the best decorative effect.

Construction Method:

1) Remove dust, oil and rust surface treatment thoroughly before painting steel construction. Brushing with two anti-rust layers. Before proceeding with the construction of the fire retardant paint, the anti-rust primer should completely dry. Steel primed longer must be remove dust and feculence thoroughly before coating construction.

2) Construction environment suitable for temperatures 5-40 degrees Celsius. Relative humidity 80% or less. Good ventilation condition. When the wind speed is large, rainy days or component surface condensation, not suitable for construction.

3) Using brush, roller or spray method. Paint before use, should be fully Stir (recommended drill mixer).

When doing construction, in order to ensure adhesion force, the thickness of first layer should ≤1mm, paint with next layer before you should make sure that the before layer is dry completely. Every layer thickness <1.5mm, until the total thickness reached the design requirements. Unused paint should be sealed and stored for reuse.

1) The coating formulation is completed at the factory, before construction must stir fully. If the paint is too thick during construction, can be added to the total amount does not exceed 5% of the water for consistency adjustment.

2) The paint is strictly prohibited mix use with other paints.

3) When the paint haven’t dry completely, fireproof coating in long rain soaked is strictly prohibited.

4) Fireproof Ability

According to GB14907-2002, Thi n Type Steel Structure Intumescent Fire Retardant Coating on 36b shape steel, under 136KN force, test result is below.

Coating thickness (mm)

2.1

2.6

3.2

Fireproof limit (h)

0.5

1.0

1.5

Notice:

Storage & Packing

1. Packed with plastic bucket, 20kg/bucket.

2. Storage temperature at 5 degrees Celsius - 35 degrees Celsius in a cool and ventilation place, shelf life of six months. During transport storage process should prevent exposure, rain, heavy pressure and upside down.

Advantages-why-us