"D' type hydrapulper is used for continuously pulping waste paper. The pulper tank shape is 'DR' structure, increasing the contact times between the rotor and pulp, so the pulping time is shorter.The power transmission has pulley transmission and reducer transmission two ways.
"D" type hydrapulper, hydrapurger II, drum screen, ragger and grapple is made up of continuous pulping and discharging system. This system is used for pulping OCC, AOCC, etc, removing the plastics, styrol foam and other light and heavy impurities from the pulper tank as early as possible, to avoid the light and heavy impurities being broken and flow through the screen plate, so the capacity is higher and the pulp is cleaner.
1.Delivery Time:
20-120 days (base on actural production plan)after receipt of 30% deposit.
2.Payment Term:
30% T/T deposit, 70% T/T before loading to the container.
3. Quality Standard:
According to China Industry Standards and agreement of both parties.
4. The Warranty Period and Terms for quallity, repair, replacement:
a. 12 months from the date of successful running test,base on the line installed by the seller's engineer.
b. 13 months from the date of goods arrive at the destination port of the buyer, base on the line installed by the local engineer of the buyer.
c. Rubber-faced products is 6 months.
5.Inspection and cost:
The buyer come to China(supplier's workshop) f or inspection according to the drawing and official offer. I f the buyer need SGS or CIQ Certificates, the seller is not responsible for the inspection cost.
6. The transportation:
The seller is responsible for the packaging of the entire equipments, and loading all equipments into the container.
7.The Installation, trial production and training:
Installing time 60-120days, engineers are available to overseas for installation
and trial production and the training of the machine, and produce qualified products in accordance with contract requirements.
The buyer pays the salary, visa fee, come and back air fare, room and board of the engineer.
8.Repairing service and the relevent cost:
The seller will arrange the repairman to overseas or adopt other solving ways
within 20 days after receipt of the machine fault notice and good understading/communication for both parties. The relevent cost be negociated by both parties base on the actural situation.
9. Accessories:
The offer is excluding pipes and valves for water and slurry transporting,
the electric wire, the cement/brick/sand for paper slurry chest, other installing tool of installing.
1.Pre-sales Service
Proposing the most suitable scheme and equipment for our clients.
Designing and fabricating targeted products according to the special requirements of clients.
Training periodically high qualified service technician.
2.After-sales Service
Assisting our clients for foundation construction of equipment.
Dispatching engineers to install and debug equipment.
Training the first-line operators on site.
Regularly visit clients to solve production problems.