We promise
|
|
All customer-centric, never for short-term profit, and sell long-term benefits
|
|
|
|||
We produce
|
|
Mold, prototype, injection molding, product assembly, surface printing, spraying the surface integration
|
|
|
|||
Pls provide
|
|
2D, 3D, samples, or the size of the multi-angle pictures
|
|
|
|||
Mould Time
|
|
20-35 Days
|
|
|
|||
Product time
|
|
7-15 Days
|
|
|
|||
Moud precision
|
|
+/-0.01mm
|
|
|
|||
Mould life
|
|
50-100 million shots
|
|
|
|||
Producing Process
|
|
Audit drawings - mold flow analysis - design validation - Custom Materials - mold processing - core processing - electrode
machining - Runner system processing - parts processing and procurement - machining acceptance - cavity surface treatment process - complex mode Die - The entire mold surface coating - Mounting plate - mold sample - sample test - sending samples |
|
|
|||
Mould cavity
|
|
One cavity, multi-cavity or same different products be made together
|
|
|
|||
Mould material
|
|
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13
|
|
|
|||
Runner system
|
|
Hot runner and cold runner
|
|
|
|||
Base material
|
|
P20,2738,2344,718,S136,8407,NAK80,SKD61,H13
|
|
|
|||
Finish
|
|
Pitting the word, mirror finish, matte surface, striae
|
|
|
|||
Standard
|
|
HASCO, DME or dependent upon
|
|
|
|||
Main thechnology
|
|
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes, surface Finish, etc.
|
|
|
|||
Software
|
|
CAD,PRO-E,UG Design Time: 1-3 days (normal circumstances)
|
|
|
|||
Product material
|
|
ABS,PP,PC,PA6,PA66,TPU,POM,PBT,PVC,HIPS,PMMA,TPE,PC/ABS, TPV, TPO,T PR,EVA,HDPE,LDPE,CPVC,PVDF,PPSU.PPS.
|
|
|
|||
Quality system
|
|
ISO9001:2008
|
|
|
|||
Establish time
|
|
20days
|
|
|
|||
Equipment
|
|
CNC,EDM,Cutting off Machine,plastic machinery,etc plastic suitcasemould zhejiang
|
|
|